


Kraft Heinz Christchurch final seal over non-slip surface

Drylands Winery Marlborough industrial floor application

ANZCO Foods Blenheim plant application of trowel on industrial flooring system.

Drylands Winery Blenheim preparation and mixing of epoxy mortar
Rai Valley Dairy Shed final application of Sikafloor

ANZCO Foods Blenheim new tripe room finished floor.

West Coast fish factory industrial floor remedial work for MPI audit

Blake Surfacings team ready for after hours remedial work at Goodman Fielder

Waitangi Seafoods Chatham Islands container shipped onsite
New Hororata Fire Station specialist epoxy flooring system
Seafood processing plant food grade flooring system to MPI standard
Progressive Enterprises Hornby distribution center specialised finish
Material for flooring project arrive onsite at Invercargil freezing works
Onsite workshop provides minimum disruption to production
Invercargil freezing works new expoxy floor and coving system
Foodstuffs Distribution Center acid resistant flooring to forklift bay
Southbridge Firestation new epoxy floor system
Aotearoa Fisheries red line foot bath new flooring and coving
Aotearoa Fisheries red line factory entrance new floor and coving
Drylands Winery coving and floor joint detail
Drylands Winery coving and floor joint detail
Villa Maria Winery remedial repairs prior to 2016 vintage
Upgrade to Hantz Honey factory in Leeston
Hantz Honey factory
Westland Milk Products Dryer No.7 CIP Kitchen chemical resistant coating
Talleys Group Ltd, Havelock plant winter maintenance work
Talleys Fishmeal plant at Westport
Kraft Heinz dedicated non-slip walkways
Kraft Heinz floor upgrade
Mike Newman, Meaters of Marlborough
Meaters of Marlborough early stage job prep.
Meaters of Marlborough finished epoxy floor on completion.
ANZCO Foods factory floor alterations
Kim Crawford Winery - Red Cellar before floor upgrade

Kim Crawford Winery - Red Cellar after floor upgrade
Kim Crawford Winery epoxy coving preparation and finish
Aroma Mussel Factory - Havelock
Aroma Mussel Factory - Havelock
Aroma Mussel Factory - Havelock
Aroma Mussel Factory - Havelock
Smooth finish - Honey Factory
Smooth finish - Honey Factory
Smooth finish - Honey Factory

Site preparation and setup

Smooth finish - Honey Factory

Smooth finish - Honey Factory

Heavy duty workshop floor upgrade - before

Heavy duty workshop floor upgrade - after installation

Heavy duty workshop floor upgrade - after installation
Talleys Westport - Blast Freezer
Aroma Mussel Barge - Deck Upgrade
Aroma Mussel Barge - Deck Upgrade
Aroma Mussel Barge - Deck Upgrade
Taylor Engineering Flooring Upgrade for Glass Retail Facility
Taylor Engineering Flooring Upgrade for Glass Retail Facility
Taylor Engineering Flooring Upgrade for Glass Retail Facility

Elite Foods Blenheim - Surface Preparation

Elite Foods Blenheim - Surface Finish

Elite Foods Blenheim - Surface Finish

The Blake Surfacings Team

Marlborough Butchery on Completion

Talley's Blenheim Upgraded Corn Line

Talley's Blenheim Upgraded Corn Line